Rodney M. Honeycutt, P.E. Principle
Mr. Honeycutt has over 30 years experience in all phases of civil engineering including various administrative duties. He has managed major water and wastewater projects for city, county and state governments. He has also been project manager and principal-in-charge of five (5) indefinite delivery/quantity (open-end) civil engineering contracts with various departments of the Department
of Defense (DOD). Other responsibilities have included the preparation of reports and studies involving alternative analyses, feasibility studies, plans and specifications and contract documents. Mr. Honeycutt also served as County Engineer for Cumberland County, North Carolina for three and one-half (3 ½) years. Mr. Honeycutt is experienced in AutoCAD 14 and a variety of PC programs.
Education
B.S./1972/Civil Engineering, University
of North Carolina at Charlotte
Registration
P.E./1976/Civil Engineering, NC #7211 P.E./1981/Civil Engineering, MD #12545
P.E./1983/Civil Engineering, VA #14045 P.E./1993/Civil Engineering, FL #46917 |
Project Experience
City of Titusville’s Water and Wastewater Treatment System Major Expansion, Titusville, FL; Principal-in-Charge of providing professional surveying services as a sub-consultant to Professional Engineering Consultants, Inc. (PEC) for major expansion of the City’s advanced wastewater treatment plant and wetland effluent system. Including topography, surveying, easement
maps and legal descriptions for 15 agreements, construction surveys, cross-sections of borrow pits, re-establish property boundaries and monuments for three (3) 400± acre sites, locate numerous monuments for pipeline routes, horizontal and vertical control provided for entire project. All of the survey data was provided to the engineering consultants in AutoCAD via modem and phone line by use of PC Anywhere software.
Brevard County Parks and Recreation, Solid Waste, Utility and Facilities Construction Departments, Brevard County, FL; Principal-in-Charge for
engineering and surveying services on an as needed bases for the past three (3) years. Services were site design, cost estimates and state/local permitting for a 1,440 linear feet (LF) revetment at Spessard Holland Golf Course, Cuyler Park Expansion, landfill operation sites, horizontal/vertical control topography and locations for expansion, landfill mitigation sites, well locations, plat property survey, cross-sections for wetlands
mitigation, topo/tree surveys, agency review/permitting, well site easements and access, set piezometers with elevations, H/V controls, re-establish property corners and a library expansion site.
Cracker Barrel Old Country Store, Titusville, FL; Principal-in-Charge for a 10,200 S.F. restaurant with boundary and topography surveys, rezoning/annexation, conceptual site design including sewer, water reclaimed water, grading, drainage, stormwater management, parking, lighting,
landscaping, FDOT access permitting, wetland mitigation and as-built certifications, United Stated Army Corp of Engineers, FDOT, SJRWMD and Brevard County permitting required.
West Orange Trail Phase IV, Orange County, FL; Principal-in-Charge of surveying, including topography, tree location, specimen identification, easements and boundary survey for Trailhead parking lot location for approximately nine (9) miles of proposed biking and hiking trail.
Solomons Island Wastewater Treatment Facilities, Calvert County, MD; Project Manager for environmental/sanitary design of 0.7 MGD wastewater treatment plant including soil absorption and 24,000 feet of sewers, several pumping stations, lift stations and
preparation of an operations and maintenance manual. The treatment facility included a 100,000 gallon equalization basin with aeration, dual double pump installation to double the discharge head capacity, five (5) miles of force main, dual clarigester, 24-hour storage to ensure flooding of rapid infiltration basins, dual vacuum sludge drying beds and administration and maintenance buildings. Construction management services on a full-time
basis were provided.
Cobb Island Wastewater Treatment Plant, Charles County, MD; Principal-in-Charge for design, plans, specifications and construction management for an alternative 158,000 GPD sewerage collection system and treatment facility featuring 454 septic tanks, 43,200
feet of variable grade gravity collectors and 8,500 feet of low pressure force main to connect the 109 septic tank effluent pump stations to the land application treatment facility.
Patuxent naval Air Station, Chlorination Facility Rehabilitation, St. Mary’s County, MD; Principal-in-Charge for an evaluation, analysis and rehabilitation design of chlorination system at wastewater treatment facility and potable water wells.
Tilgham Island Wastewater Treatment Facilities, Talbot County, MD; Project manager for environmental/sanitary design of 0.15 MGD treatment plant and appurtenances including three 93) duplex pumping stations, 23,100 feet of sewer lines and 6,300 feet of force
main. Provided full-time construction inspection and management service in addition to providing an operations and maintenance manual.
Chestertown Wastewater Treatment Plant, Kent County, MD; Principal-in-Charge for modification of existing wastewater
treatment plant to include a new chlorination facility, dechlorination/post aeration facility, construction of a new 1,650 feet 18-inch diameter outfall into the Chester River, construction of an administration and maintenance building and renovation of the main pumping station at Radcliffe Creek. Provided full-time construction inspection and management services.
Maryland correctional Institution Wastewater Treatment Plant, Washington County, MD; Project Manager/Engineer for design, plans, specifications and construction phase services for a new 1.23 MGD treatment plant facility to replace the existing facility
including feasibility studies for the re-employment of various structures and the rehabilitation of the anaerobic digesters.
Hollyneck Wastewater Collection System, Baltimore County, MD; Principal-in-Charge of preliminary design, plans and specifications for a
wastewater collection system to serve the 130 existing homes and businesses in this waterfront area. Work included grinder pumps and pressure sewers as well as more conventional pumping systems.
Kopia 3054, Shenandoah School 3086 and Conway Central 3083, Orange County, FL; Principal-in-Charge for a three (3) pump stations site for Orange County. Completed site survey including property location, topography, utility location and easement right-of-way. Provided base sheets in
AutoCAD format.
Christmas Airestream R/V Park, Christmas, FL; Principal-in-Charge for providing engineering, surveying and permitting services for community
service building addition to a R/V park.
Oak Trails at Meadowridge, Titusville, FL; Principal-in-Charge of rezoning for approximately 160 Single- Family lot subdivision and 225 unit Multi-Family apartments. Conceptual layout and City of Titusville (COT) permitting required.
Walkabout PUD, Titusville/Mims, FL: Principal-in-Charge of permitting for an 18-hole LPGA certified golf course and a 9-hole par 3. Permitting
included Brevard County and St. Johns River Water Management District (SJRWMD).
Oak Trail, 18th Street and U.S. Highway No. 1 Water Mains, Edgewater, FL; Principal-in-Charge of surveying, design, engineering,
permitting and as-built certifications for new water service.
Pelican Place, Edgewater, FL; Principal-in-Charge of surveying, engineering, permitting and design of existing dirt road serving residential area.
Satellite Processing Facility, Cape Canaveral, FL; Principal-in-Charge of feasibility study including wetland, scrub jay and gopher tortoise review and topography and permitting for 25 Ac. site.
Kennedy Point Yacht Club and Marina/Condo/Restaurant, Titusville, FL; Principal-in-Charge of Area Impact Plan and Conditional Use Permit (CUP)
for new condominium, restaurant and marina expansion. COT, SJRMD and Department of Transportation (FDOT) permitting provided.
KMC Telecommunications, Inc., Cocoa Beach, FL; Principal-in-Charge of surveying services which included location/topography and legal for
easements for a telephone switch gear facility.
Titusville High School Renovation and Addition, Titusville, FL; Principal-in-Charge for design including all site work for
high school renovation including grading, storm drainage, stormwater management, water distribution and sewer collection system. Sewer system consisted of a new 700 GPM submersible duplex pumping station and 3,000 LF of eight-inch (8”) sanitary sewer. There are 17 existing and new connections to the existing system that must be maintained during construction. State and local permitting required.
Florida Department of Management Services, Brevard Regional Juvenile Detention Center, Sharpes, FL; Principal-in-Charge for design, permitting and construction administration for modification of stormwater management system for two and one-half (2 ½) acre site
with County and State permitting.
Lowe’s of Titusville, Titusville, FL;
Principal-in-Charge/Engineer for feasibility study, environmental audits, boundary survey, mitigation, topography, rezoning/annexation, site design (included sanitary sewer system to serve a 150,000 S.F. retail center on a 23 Ac. site) water, grading, drainage, stormwater management, parking, lighting, landscaping, wetland mitigation, soil borings, traffic study, bid documents and specifications, construction administration and as-built
certifications. Federal, State and local permitting required.
Spessard Holland Golf Course Revetment, Melbourne beach, FL; Principal-in-Charge for design of sanitary sewer lift station to serve a 39,000 S.F. physical therapy/fitness center complex. State and local permitting required.
Eagle Point at Bent Oak Subdivision, Titusville, FL; Principal-in-Charge of design, plans and permitting of a 39 lot
residential subdivision including water, sewer, storm drainage and stormwater management.
Oaks at Lakefront Subdivision, Merritt Island, FL; Principal-in-Charge for design, plans and permitting of a 22 lot
residential subdivision including water, septic, storm drainage and stormwater management.
Las Verdes Townhomes, LaCita Subdivision, Titusville, FL; Principal-in-Charge for a site design of residential townhome
units including subdivision streets with sewer, water, grading, drainage and stormwater management. SJRMWD and COT permitting required.
Royal Oak Medical Center, Titusville, FL; Principal-in-Charge for a 10,000 S.F. medical office complex with sewer, water,
grading, drainage and stormwater management. Florida Department of Environmental Protection (FDEP) and COT permitting required.
Gas Mart-Sisson Road/State Road 405, Titusville, FL; Principal-in-Charge responsible for engineering design, plans and
permitting for a 3,132 S.F. gas mart including FDOT and FDEP permitting. A lift station was also designed to serve the station. The project is located within the City of Titusville Area of Critical Concern.
Gas Mart-I-95/State Road 50-Titusville, FL; Principal-in-Charge of engineering design, plans and permitting for a 3,777 S.F. gas mart including a Dairy Queen drive-thru, including FDEP permitting. A small wetland area on the northwest corner of the project was
permitted without mitigation.
Eckerds, Port St. John, FL; Principal-in-Charge responsible for engineering design, plans and permitting for a 13,050 S.F. drug mart including water, sewer, parking, storm drainage, stormwater management. FDOT, FDEP, SJRWMD and Brevard County permitting was
required.
Lemon, Coleman, Mantor Streets and Area II Stormwater
Improvements, Titusville, FL; Principal-in-Charge for design and permitting for paving of three (3) existing dirt streets including drainage and stormwater management. Stormwater management for one (1) street consisted of road side swales for a curbed street to meet SJRWMD minimal stormwater management requirements. Stormwater management for the other two (2) streets consisted of existing and enlarging a drainage way
(culverts) under U.S. Highway No. 1 in an area with a split median and designing a 1.8 Ac. water management basin. The management basin was also a retrofit basin in the City’s Area II Watershed. An outfall to the Indian River was also included. Permitting included FDOT, SJRWMD and COT.
Route survey for West Orange Trail Phase IV including topography, tree locations, utility locations, base maps and
easement maps for approximately nine (9) miles of trail.
Patapsco Pumping Station, Anne Arundel County, MD; Principal-in-Charge for reporting, design, plans and specifications
for the upgrading for a 1.73 MGD pumping station to a 3.0 MGD pumping station and the addition of stand-by power. Updated station to Anne Arundel County standards. Provided construction phase services.
West Shadyside Sewer, Shadyside, Anne Arundel County, MD; Principal-in-Charge for design of two (2) submersible pump
stations with standby power, 17,000 feet of eight-inch (8”) and ten-inch (10”) diameter gravity sewer and 3,500 feet of six-inch (6”) force main.
Vicon, Inc., Elkton, Cecil County, MD; Project Manager for feasibility study for sewer extension to service
industrial/commercial area. Study included service area flow projections.
Maryland Route 291, Kent County, MD; Project Engineer for design of 2,700 feet of ten-inch (10”) gravity sewer extension.
Sewer Collector for Maryland Route 279 Corridor, Cecil County, MD; Project Engineer for design of 3.500 feet of 12-inch gravity collector, submersible duplex pumping station (660 MPG) with flow metering and stand-by power and 12,000 feet of ten-inch (10”) force
main.
Dowerhouse Investment, Prince George’s County, MD; Project manager design of stormwater management basin, storm
drainage, site grading, parking, on-site water and sewer for four (4) major buildings (250,000 S.F. each).
Harbage Subdivision, Severna park, Ann Arundel County, MD; project Manager for a critical area study, design of water
and sewer extensions, road inputs and location of house and setbacks.
Comfort Inn, Anne Arundel County, MD; Principal-in-Charge for a 200 unit hotel including utilizing an existing restaurant at BWI Airport to include grading, paving, stormwater management and utilities.
E.N.W.S. Building, Patuxent navel Air Station, St. Mary’s County, MD; Principal-in-Charge for providing plans for water, sewer electricity for proposed laboratory building including the design of storm drainage, stormwater management and site grading plan.
Odenton Commuter Rail Station, Anne Arundel County, MD; Principal-in-Charge of design for a 250 space parking facility,
storm drainage and stormwater management.
Chesapeake bay Business Park, Queen Anne’s County, MD; Principal-in-Charge of plans and specifications for complete
water system including water supply, 250 GPM potable water treatment plant with expansion capabilities, 250,000 gallon elevated water storage tank, 5,500 feet of 12 inch and 16 inch water main and distribution system to service a 159 Ac. business park. Construction inspection and management services.
Naval Surface Warfare Center, Dahlgren, VA; Principal-in-Charge of design, plans and specifications for a new 500 GPM potable water well to include the well house, well, pump, piping to existing main and water treatment.
Patuxent Naval Air Station, Patuxent River, St. Mary’s County, MD; Principal-in-Charge of testing, evaluation and study
of two (2) out-of-service wells to identify deficiencies and recommend solutions for wells to become operational.
Thompson Creek Water Plant, Queen Anne’s County, MD; Principal-in-Charge of design, plans and specifications for water treatment facility consisting of dual 500 GPM Trident water treatment plant including backwash, sludge surge tank, piping layout, aeration,
chemical feed, process control and other associated equipment.
King’s Mountain Water System, NC; Project Engineer for design of a 4.0 MGD expansion to conventional surface water treatment facility and 12 inch to 24 inch water main replacement to upgrade old city water distribution system. Design included study to
determine sections of mains and valves in need of repair or replacement.
Franklin Water System, Macon County, NC; Project Engineer for design of 14,000 feet of 16 inch water main and new 2.0
MGP conventional surface water treatment plant. Water filtration plant consisted of raw water intake and pumping station, flash mix, sedimentation basins, filtration, clear well, backwash, sludge disposal, process control, chemical feed and associated appurtenances.
Iredell County Water Distribution System, Iredell County, NC; Project Engineer for design of several miles of ten-inch (10”) and smaller water distribution system, ground storage, potable water well/treatment and booster pumping station for rural water company.
Cross Deys-Cross Anchors Water, Union, SC; Project Engineer for design of 40 miles of 12 inch and smaller water
distribution system for community water system, elevated water storage tank, potable water well/treatment and booster pumping station.
Mulberry-Fairplain Water System, North Wilkesboro, NC; Project engineer for design of several miles of eight-inch (8”)
and smaller water distribution system and administration building for community water system.
Alexander County Water System, Taylorsville, NC; Project Engineer for design of water extensions to existing community
water distribution system, upgrading of surface water treatment plant including settling tubes and elevated storage tank.
Town of Spencer, NC; Project Manager/Engineer for rehabilitation of Forest Drive roadway including the design for
relocation of 1,500 feet of water main and sanitary sewer to include expansion of the existing storm drainage system.
Town of Sylva, NC; Project Engineer for design of 5,000 feet of eight-inch (8”) main replacement from an existing water
treatment plant to the town distribution system and surface water treatment plant upgrade including raw water storage facility, addition of dual pressure filters, backwash pumps, process control, new process piping and building rehabilitation and necessary appurtenances.
Severndale Water Treatment Plant Upgrade Inspection Services, Anne Arundel County, MD; Principal-in-Charge of construction management and inspection services for the upgrade of the existing Severndale Water Treatment Plant to include new lime feed control
building, bin activator and related controls, new filter valves and actuators.
Naval Surface Warfare Center, Dahlgren, VA; Principal-in-Charge of open-end contract for civil engineering design services at Dahlgren, VA; Wallop Island, VA; and White Oak, MD; (1) Traffic, parking and signage study at Dahlgren, VA. (2) Rehabilitation of
roadway and design of paved parking area at White Oak, MD. (3) Repair and rehabilitation of two (2) 100,000 gallon elevated water storage tanks. (4) Location, boundary and topographic surveys to include title search, plat and description for tracking station. (5) Design of new well, well house, treatment and appurtenances for new water supply at Dahlgren, VA. (6) Geometric improvements to roadway as a result of traffic study including
widening of road, re-striping of pavement and redesign of the post office entrance, traffic patterns and road signage.
Patuxent Naval Air Station, St. Mary’s County, MD; Principal-in-Charge of an open-end contract for civil engineering design services. (1) Design of parking lot near Building 1406 to include stormwater management. (2) Site plans to accommodate two (2)
pre-engineered metal buildings. Each plan included sidewalks, electrical site utilities, storm drainage, and stormwater management. (3) Exhaust stack repair at the Jet Engine Test Facility. (4) Design of two (2) potable water wells to include investigative studies for repairs. (5) An investigative study of conditions of the seawall for adequacy, reliability and subsequent design of repairs and recommendations for control of beach erosion
at Point Lookout.
Patuxent Navel Air Station, St. Mary’s County, MD; Principal-in-Charge of an open-end engineering contract that
included: (1) Shoreline stabilization for two (2) theodolite station sites. (2) Paving bungalow and cottage paring areas to Solomon’s Annex. (3) Boundary and cadastral surveys. (4) Catapult deck joint sealant design. (5) Design of fuel storage facility. (6) Chlorination of nine (9) wells and wastewater treatment facility.
U.S. Army Corps of Engineers, Baltimore District, MD; Principal-in-Charge of an open-end, one-year contract (1988) for miscellaneous surveying services in MD, DE, PA, VA and Washington D.C.
VA Medical Center, Ft. Howard, Baltimore, MD; Principal-in-Charge of study, utilizing the Kentucky Pipes Program involving the design of 3,050, eight-inch (8”) and 12 inch water lines, modifications to chlorination system to fit new piping alignment, design of
a 400,000 gallon elevated water storage tank. Included was the analysis of the existing water system along with plans and specifications for corrective measures. Construction phase services including shop drawing review and as-built drawing preparation.
South River Colony, Anne Arundel County, MD; Project Manager for design of MD 214 and Old 2. Developed sketch plans and final drawings for two and one-half (2 ½) miles of rural highway upgraded to an urban section. Roadway alignments were developed from field
survey data. Profiles set to closely match the existing pavements. Drainage storm sewer system was designed to reduce the impact of the construction on adjacent properties. A four (4) stage traffic control plan was developed to suggest a viable scenario to maintain traffic during construction. Signing plans, pavement marking plans, drainage plans were also prepared for construction.
Fallard Court, Riverdale, Prince George’s County, MD; Principal-in-Charge of roadway design to include grading, sub-base
paving, storm drainage, water and sewer and right-of-way modifications.
White Oak Naval Warfare Weapons Center, Silver Spring, Montgomery County, MD; principal-in-Charge of road repair and
rehabilitation of 5,000 feet to two (2) lane roadway and 65,000 S.Y. of paved parking area.
Engineering Studies for Five (5) Roads, Howard County, MD; Project Manager for preliminary engineering design for the
realignment of five (5) roads located in Howard County, MD. These roads were Annapolis Road, Gorman Road, All Saints Road, Leishear Road and Loop Road.
Murray Hill Road, Howard County, MD; Principal-in-Charge for design of 4,400 feet of road way including steep grades and tie-in coordination to new bridge over Middle Patuxent River.
Mountain Road Emergency Bypass Route, Anne Arundel County, MD; Principal-in-Charge for preparation of report, field
surveys, metes and bounds right-of-way plats for 0.5 miles of interconnecting roadway to provide a means of emergency by-pass for a dead-end road on a peninsula.
County-wide Solid Waste Resource Recovery Project Development Plan, Cumberland County, ND; Project Manager for plans including type of facility, location and method for financing.
County Sanitary Landfill (Solid Waste), Cumberland County, NC; Project Manager/Engineer preparation of final plans and reports necessary for review and approval by regulating agencies. Engineering including site layout, original and final topographic maps,
site drainage during landfill operation and after site completion, perched ground water table elimination, groundwater monitoring program, traffic routing, erosion sedimentation design and land use plan after landfill completion, The landfill was situated on a 365 acre tract with a 20 year projected life to serve a population of 270,000.
Woodhaven I, Anne Arundel County, MD; Principal-in-Charge of design of 54 lot subdivision including water, septic, storm drainage, sediment control, roads, bridges (4), Stormwater management and construction stakeout.
Woodhaven II-Chaney, Anne Arundel County, MD; Principal-in-Charge of design of 15 lot subdivision including water, septic, storm drainage, sediment control, roads, bridges, stormwater management and construction stakeout.
Annapolis Overlook, Annapolis, Anne Arundel County, MD; Principal-in-Charge of civil site design of 30 acres condominium
project. Services provided included site plan, grading, roads, utilities, stormwater management and landscaping.
Wynnewood Subdivision, Anne Arundel, County, MD; Principal-in-Charge of preparation for design drawings for 87 lot RA zoned project. Includes preparation of subdivision drawings and processing through Anne Arundel County.
Beechwood Hill, Townhouses, Annapolis, Anne Arundel County, MD; Principal-in-Charge for civil site design of 63 unit development including water and sewer distribution, storm drain, roads, grading, sediment and erosion control and stormwater management.
Hunt Meadow Townhouses (Section 2), Annapolis, Anne Arundel County, MD; Principal-in-Charge for civil site design of 50 units including on-site water and sewer, roads, site and grading plans.
Oxford Landing, Annapolis, Anne Arundel County, MD; Principal-in-Charge of a 60 home subdivision including retrofit of stormwater management design.
Greenbriar Office Park, Annaplis, Anne Arundel County, MD; Principal-in-Charge of site consisting of 7.21 Ac. including
five (5)-story office building and parking. Final plans included site grading, pavement design and storm drainage, stormwater management, water and sewer. Stormwater management consists of upgrading stone-filled trenches providing both water quality and peak flow management.
Crofton Meadows Elementary School, Anne Arundel County, MD; principal-in-Charge for design of site grading, storm drainage and stormwater management for a new elementary school. Sanitary sewer and water extensions were also included.
Deal Elementary School, Anne Arundel County, MD; Principal-in-Charge of renovation and expansion of an existing school. Design included site grading, additional parking, storm drainage, new stormwater management pond. Public water and sewer were available and
extended to the site.
Women’s Hospital, Anne Arundel County, MD; Principal-in-Charge of design for site grading, storm drainage, stormwater management facilities, major road extension to serve the facility plus off-site water and sewer extensions. The hospital is 36 beds with room
to expand 20 additional beds and a 75,000 S.F. medical office building.
Pathways Treatment Center, Anne Arundel County, MD; Principal-in-Charge of management and design of civil/site plans for
construction of a 30,000 S.F. hospital facility in the Parole town Center area. Prepared a detailed site plan that included the location and tabulation of parking and loading, building footprints and locations, entrances, roads, and drive lanes; location of public utilities, sidewalks, curbs, gutter location, site coverage computations, location of zoning and wetlands, Designed a grading plan that showed existing and proposed grades, design
of the onsite storm drainage system, location of disturbed areas, design and details of the stormwater management systems and sediment/erosion control measures. A detailed study was performed of the storm drainage characteristics of the proposed development and a stormwater management system was designed to perform stormwater quality and quantity management for the site. Public water and sewer service was provided by extension of existing
gravity lines from Truman Parkway or Riva Road to the site. Designed roadway entrances and widening to accommodate the proposed development of this project. Completed plans and prepared the necessary applications, cost estimates and agreements for submittal of the plans to the County for building/grading permits. Part of a project team consisting of several consultants working closely with the Anne Arundel County Hospital.
|